ID 720550

Archived

Dallas ISD - Org 197 - Bishop Arts Stem Academy - Renovation, Dallas, TX

Dallas County

Bid Date: 10/02/2024 at 02:00pm

Pre-Bid: 09/09/2024
Zoom Meeting Information https://us05web.zoom.us/j/87271920590?pwd=XJ7VXpqsfbp0nRdTpWS61a5BFYBDUg.1 Meeting ID: 872 7192 0590. Passcode: 5nAybD.

Estimate: $797,928.00

Trades: *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, Building Maintenance, Installation & Repair Services - Renovations, Restoration, Repairs, Rehabilitation, Improvements, Demolition Contractor, Building Moving, Wrecking: General Engineering Contractor or General Building Contractor, Non-Electrical Signs & Signage Contractor: Interior Advertising or Wayfinding, Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl

Project consists of the following: Renovation of existing building to include site improvements, life cycle upgrades and interior finish out. refer to Architectural drawings. 1. Site signage: Metal post-and-panel signage with concrete footings and powder coat/painted graphics. 2. Selective demolition of existing building elements. Salvage as indicated. Patching and repairing of demotion as required. 3. New architectural storefront entry elements, including all hardware to make secure. 4. New concrete topping slab to provide adequate, code-compliant transitions and drainage. Reprofiling of existing concrete stairs as required. Leveling and prepping existing concrete as required to receive new construction. 5. New brickwork to match existing, extents as indicated on drawings 6. New waterproofing to tie into existing, including priming, flashing, coating, etc. 7. New interior metal stud framing and gypsum board 8. New doors and hardware 9. New plastic laminate-clad millwork/casework. Casework hardware as indicated 10. Manual window shades 11. Finishes include, but not limited to: a. Painting b. Rubber base c. Vinyl tile d. Carpet tile e. Entryway walk-off surfacing f. Acoustic panel and gypsum board ceilings 12. Mechanical demolition 13. New mechanical rooftop unit including controls 14. Electrical demolition 15. New electrical wiring, routing, and receptacles as indicated 16. New lighting fixtures as indicated 17. New fire alarm as indicated 18. Plumbing demolition 19. New plumbing fixtures as scheduled 20. New network/security/communications infrastructure as indicated. Bonds required. Prevailing wages.

Dallas ISD Independent School District TX
 Zafar Syed
 Login or create an account To view email

Published 09/03/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.