ID 718347
Archived
Fort Bend County
Owner Reference: 201-028-09 DST (J)
Bid Date: 10/02/2024 at 02:00pm
Pre-Bid: 08/28/2024
Join Zoom Meeting https://us06web.zoom.us/j/89148485555?pwd=bEuoMDIUJ0an1DpVkGa9bf3Y9QSWBK.1 Meeting ID: 891 4848 5555 Passcode: 291537 --- One tap mobile +13462487799,,89148485555#,,,,*291537# US (Houston) +12532050468,,89148485555#,,,,*291537# US --- Dial by your location • +1 346 248 7799 US (Houston) • +1 253 205 0468 US • +1 253 215 8782 US (Tacoma) • +1 669 444 9171 US • +1 719 359 4580 US • +1 720 707 2699 US (Denver) • +1 312 626 6799 US (Chicago) • +1 360 209 5623 US • +1 386 347 5053 US • +1 507 473 4847 US • +1 564 217 2000 US • +1 646 558 8656 US (New York) • +1 646 931 3860 US • +1 689 278 1000 US • +1 301 715 8592 US (Washington DC) • +1 305 224 1968 US • +1 309 205 3325 US Meeting ID: 891 4848 5555 Passcode: 291537 Find your local number: https://us06web.zoom.us/u/kcGhXHGBb6.
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sanitation System, Sewer Connection & Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC; Subcontractor Opportunities
Project scope shall include the installation of approximately 2,508 LF of 8" PVC waterline; 2,440 LF of 8" PVC gravity sanitary sewer; and 3,554 LF of 24”- 72” RCP storm sewer. Bonds required. Prevailing wages.
Fort Bend County MUD253 Municipal Utility District TX
EHRA Engineering
Login or create an account To view email
Published 08/19/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.