ID 724651

Archived

City of Sherman Post Oak Wastewater Treatment Plant - Electrical Upgrades 2024-22, Sherman, TX

Grayson County

Owner Reference: 1422-003-01

Bid Date: 10/18/2024 at 03:00pm

Pre-Bid: 10/09/2024
Post Oak Wastewater Treatment Plant, 1800 E. FM 1417, Sherman, TX 75090. Pre-bid meeting is non-mandatory and will include a site walk-through.

Estimate: $10,000,000-$13,000,000

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Generator Contractor - Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet

Project consists of installing a new 12.47kV distribution loop for the WWTP including a new electrical building with main switchgear, medium voltage paralleling generators, medium voltage pad mounted four- and six-way distribution switchgears, pad mounted 12.47kV to 480V distribution transformers, concrete encased and concrete capped distribution ductbanks, selective demolition of existing electrical infrastructure, and realignment of existing overhead electrical service lines. Bonds required. Prevailing wages.

City of Sherman TX
 Patrick Moseley c/o Plummer Associates, Inc.
 Login or create an account To view email

Published 10/01/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.