ID 723529
Harris County
Owner Reference: 2369-006-02, C1
Bid Date: 10/10/2024 at 02:00pm
Pre-Bid: 09/27/2024 @ 09:00am
Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Masonry Contractor, Precast Concrete; Mortar Repair, Tuckpointing, Brick Pointing, Finishing Joints, Machinery and Pumps Contractor; Motors & Variable Frequency Drives, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor
The project includes second phase of improvements to the wastewater treatment plant including the construction of a 114' diameter concrete bullseye treatment plant, lift station modifications, three (3) concrete masonry unit buildings, a new concrete headworks structure, replacement of the existing motor control center, installation of new aeration blowers, installation of new activated sludge pumps, clearing and grubbing of the existing area, grading, and site paving. Bonds required. Prevailing wages.
Mariana Rodriguez
Login or create an account
Login or create an account
Owner: Faulkey Gully MUD Municipal Utility District TX
Published 09/24/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.