Harris County MUD No. 33 Chloramines Conversion and Interconnect at Water Plant No. 1 and Chloramines Conversion at Remote Well No. 1, Houston, TX

Harris County

Owner Reference: 23-034-400

Bid Date: 10/10/2024 at 02:00pm

Pre-Bid: 09/26/2024 @ 10:00am

Trades: *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Tank Cleaning, Installation & Repair, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

Construction of a CMU block LAS building, yard piping to CHCRWA meter station, installation of LAS tank and chemical metering pumps, electrical, and instrumentation at Water Plant No. 1. At the remote well site 1, installation of LAS tank and pumps inside the existing fluoride FRP building, yard piping, and electrical. Bonds required. Prevailing wages.

Odyssey Engineering Group
 Login or create an account
 Login or create an account

Owner: Harris County MUD33 Municipal Utility District #33 TX

Published 10/01/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.