ID 720368
Archived
Hays County
Owner Reference: Plum Creek Phase 1B - Doherty
Bid Date: 09/26/2024 at 10:00am
Pre-Bid: 09/12/2024
Join from PC, Mac, iOS or Android: https://wginc.zoom.us/j/91086832083 Telephone: US: +1 346 248 7799 or +1 929 436 2866 or +1 312 626 6799 Meeting ID: 910 8683 2083. Please email Aron.Trevizo@WGInc.com for an invitation to the virtual conference call. Otherwise, please use the Zoom link and telephone information in the "Location" field to access the conference call at the date and time of the pre-bid.
Trades: Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Sanitation System, Sewer Connection & Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Reservoirs, Lakes, Streams, Ponds, Channels, Water Barriers, Aquatic Plants, Wetland Restoration, Living Shorelines NAICS 562998, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment
Scope of Work of the Contract Documents includes the following: Site Work, approximately 800 LF of new roadway construction, 459 LF of sanitary sewer main, 841 LF of water main, 910 LF of electric and telecom main, and 958 LF of storm drain. Also, Scope includes a temporary drainage channel and all associated demolition and erosion control measures. Bonds required. Prevailing wages.
North Hays MUD2 Municipal Utility District TX
Aron Trevizo
Login or create an account To view email
Published 09/01/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.