ID 721005

Archived

Wright Farms Lift Station and Force Main Civil, Structural, and Electrical Construction Plans, Fort Worth, TX

Johnson County

Bid Date: 09/18/2024 at 02:00pm

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC; Subcontractor Opportunities

Wright Farms Force Main is designed to serve the 552-acre, 2,160 equivalent single-family connection residential development located along the south side of County Road 904 and both sides of County Road 1017 in the City of Cleburne, Texas. The major work will consist of installing approximately 9,720 linear feet (LF) of two parallel 8” C900 DR-25 PVC force main (approximately a total of 19,440 LF of pipe). Bonds required. Prevailing wages.

Wright Farm Municipal Management District of Johnson County TX
 Michelle Lasa, P.E. c/o Pape-Dawson Engineers
 Login or create an account To view email

Published 09/06/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.