ID 720988
Limestone County
Owner Reference: Point Enterprise WSC Tank Recoating Services - August 2024
Bid Date: 09/18/2024 at 02:00pm
1 Days until bid date
Pre-Bid: 09/04/2024 @ 10:00am
Estimate: $500,000.00
Trades: Industrial Painting & Coating Contractor: General Engineering Contractor (Includes Graffiti Removal), Tank Cleaning, Installation & Repair, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, *General Engineering Contractor GEC; Subcontractor Opportunities
The Project consists of the furnishing of all labor, materials, equipment, appurtenances and incidentals as required to properly prepare, repair, and coat four (4) ground storage tanks and four (4) hydropneumatics tanks located at the Furney Pump Station and the Cotton Gin Pump Station sites to include all associated piping, valving, vents, covers, markings, level indicators, appurtenances, accessories, testing, and site work, complete and in place. Bonds required. Prevailing wages.
Carolyn Stracik
Login or create an account
Login or create an account
Owner: Point Enterprise Water Supply Corporation TX
Published 09/06/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.