McMullen County Precinct 1 Maintenance Facility Renovations, Tilden, TX

McMullen County

Owner Reference: 20-08

Bid Date: 10/31/2024 at 02:00pm

Pre-Bid: 10/10/2024 @ 02:00pm

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Sanitation System, Sewer Connection & Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Underground Utility Contractor & Utility Locating Services: GPS, Cabling, Pipes, Power, Telecom, Potholing, Daylighting

The work under this section shall consist of furnishing all labor, superintendence, materials, tools, equipment, and all other things necessary to complete the excavation, trenching, and backfilling for utility systems, including sanitary sewer, storm drainage, water distribution, inlets, manholes and other underground construction, in conformity with the required lines, grades, and typical cross sections shown on the drawings and in accordance with specifications herein outlined. Where these facilities are part of public infrastructure the specifications of the appropriate entity (TxDOT, City, Water System, etc.) shall apply. All referrals to other specifications are to the most current edition of the Texas Department of Transportation (TxDOT) Standard Specification for Construction and Maintenance of Highways, Streets, and Bridges, which will be referred to as the “TxDOT Standard Specifications”. Bonds required. Prevailing wages.

Dale Patterson
 Login or create an account
 Login or create an account

Owner: County of McMullen TX

Published 10/02/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.