**NEW BID DATE**East Texas Municipal Utility District - ARPA Regionalization of the Winona Wastewater System, Tyler, TX

Smith County

Owner Reference: 953204.00

Bid Date: 11/13/2024 at 02:00pm

Estimate: $3,193,000

Trades: Wastewater Operator Certification: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Stat, Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Supervisory Control & Data Acquisition (SCADA): Controllers, Process & Data Automation: Hardware/Software on High-Level Machiner, Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners

Bids are invited for several items and quantities of work as follows: Construction of a new lift station including wet well, pumps, electrical, SCADA and all site work and appurtenances; rehabilitation of an existing modified clarifier-wet well and replacement of existing pumps, control panel and SCADA; installation of a new natural gas powered generator; and construction of approximately 118 LF of 10” gravity sewer main, 4,898 LF of 12” gravity sewer main and 7,284 LF of 6” sewer force main. Bonds required. Prevailing wages.

Lisa Crossman c/o Schaumburg & Polk, Inc.
 Login or create an account
 Login or create an account

Owner: East Texas MUD Municipal Utility District TX

Published 10/01/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.