ID 721805
Travis County
Owner Reference: IFB 6100 CLMC1050
Bid Date: 10/10/2024 at 03:00pm
Pre-Bid: 09/19/2024 @ 01:00pm
Estimate: $1,674,000.00
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Sanitation System, Sewer Connection & Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal
Replacement of approximately 828 LF of water and 855 LF of wastewater pipelines including associated appurtenances on Scottsdale Road and Hillspring Circle between Heflin Lane and E Martin Luther King Jr Blvd. The existing 8-inch concrete wastewater lines will be replaced with 8-inch PVC. The existing 6-inch CI water pipeline is proposed to be replaced and upgraded to an 8-inch PVC pipe. The project includes upgrading existing storm sewer drainage pipes to mitigate localized flooding. Bonds required. Prevailing wages.
Micheal Singleton
Login or create an account
Login or create an account
Owner: City of Austin TX
Published 09/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.