ID 724612

Archived

Easton Park Cota Vista and William Cannon ROW Enhancements, Houston, TX

Travis County

Owner Reference: A23073

Bid Date: 10/16/2024 at 11:00am

Pre-Bid: 10/04/2024
Virtually at www.CivcastUSA.com.

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Stormwater Pollution Prevention Plan (SWPP), Regional Flood Planning Group (RFPG), Floodproofing & Flood Risk Reduction Plans, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment

Execute all Work, including excavation, installing pipe, backfill, miscellaneous concrete and testing. Secure all construction-related permits, other than those provided by Owner, and pay for the same. Cause the Storm Water Pollution Prevention Plan (SWPPP) to be prepared and provide prior to the installation of erosion and sedimentation controls. Adherence to the requirements of the Pollution Prevention Plan for the Project including filing any required notices, and inspection and maintenance of any temporary storm water controls. Arrange for the necessary temporary water and electric service and pay for these services and all water and electricity consumed during the construction Work. Provide adequate temporary sanitary facilities. Bonds required. Prevailing wages.

Pilot Knob MUD2 Municipal Utility District TX
 Sonia Pujol c/o TBG Partners
 Login or create an account To view email

Published 10/01/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.