ID 729789
Jefferson County
Owner Reference: BH-01-008
Bid Date: 11/25/2024 at 04:00pm
4 Days until bid date
Estimate: $4M - $4.3 Million
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Work includes Installation of a four-stage stormwater treatment system Installation of a lift station, valve vault, two submersible stormwater pumps and associated accessories and appurtenances. Installation of approximately 1,200 linear feet of 8” diameter storm drain force main piping, 715 linear feet of 24” diameter gravity main piping. Installation of associated electrical wiring, cabling and devices, including instrumentation Re-grading work associated with the above items, including restoration Temporary erosion and sediment control and traffic control during construction. This project includes an apprentice utilization requirement of 15%. Bonds required. Prevailing wages.
Matt Klontz
Login or create an account
Login or create an account
Owner: Port of Port Townsend WA
Published 11/07/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.