ID 729789
Archived
Jefferson County
Owner Reference: BH-01-008
Bid Date: 11/25/2024 at 04:00pm
Estimate: $4M - $4.3 Million
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Work includes Installation of a four-stage stormwater treatment system Installation of a lift station, valve vault, two submersible stormwater pumps and associated accessories and appurtenances. Installation of approximately 1,200 linear feet of 8” diameter storm drain force main piping, 715 linear feet of 24” diameter gravity main piping. Installation of associated electrical wiring, cabling and devices, including instrumentation Re-grading work associated with the above items, including restoration Temporary erosion and sediment control and traffic control during construction. This project includes an apprentice utilization requirement of 15%. Bonds required. Prevailing wages.
Port of Port Townsend WA
Matt Klontz
Login or create an account To view email
Published 11/07/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.