ID 726997
King County
Owner Reference: CAG-24-001, WWP 27-04282
Bid Date: 11/12/2024 at 02:00pm
Estimate: $1,940,000
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Renton Highlands Sanitary Sewer Rehabilitation Phase 3 consists of: - Cured-in-Place-Pipe (CIPP) Rehabilitation of a combined total of approximately 31,300 Linear Feet (LF) of 8”, 10”, and 12” Sanitary Sewer pipe. - Trim two intruding laterals. - Install One Point Repair - Reinstatement of 420 side-sewer laterals - CIPP Rehabilitation of a combined total of approximately 2,530 LF of 8”, 10”, and 12” diameter Storm pipe. - Reinstatement of six storm-sewer laterals - Trim two intruding laterals - Pre- and post-cleaning and CCTV Inspection - Bypass pumping Bonds required. Prevailing wages.
Jesse Newman
Login or create an account
Login or create an account
Owner: City of Renton WA
Published 10/17/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.