ID 726997
Archived
King County
Owner Reference: CAG-24-001, WWP 27-04282
Bid Date: 11/12/2024 at 02:00pm
Estimate: $1,940,000
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Renton Highlands Sanitary Sewer Rehabilitation Phase 3 consists of: - Cured-in-Place-Pipe (CIPP) Rehabilitation of a combined total of approximately 31,300 Linear Feet (LF) of 8”, 10”, and 12” Sanitary Sewer pipe. - Trim two intruding laterals. - Install One Point Repair - Reinstatement of 420 side-sewer laterals - CIPP Rehabilitation of a combined total of approximately 2,530 LF of 8”, 10”, and 12” diameter Storm pipe. - Reinstatement of six storm-sewer laterals - Trim two intruding laterals - Pre- and post-cleaning and CCTV Inspection - Bypass pumping Bonds required. Prevailing wages.
City of Renton WA
Jesse Newman
Login or create an account To view email
Published 10/17/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.