Chambers Creek Regional Wastewater Treatment Plant Headbox Rehabilitation, Pierce Co, WA

Pierce County

Owner Reference: 2024-MPW-793, P-110981

Bid Date: 11/01/2024 at 01:00pm

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The work involves the replacement of existing assets, including two sluice gates, a light post, a wastewater level element, electrical for the aforementioned assets, miscellaneous pipe, and exterior hand railing. Work will also include the installation of an interior concrete coating and an interior work platform. To perform work inside the Headbox, the successful bidder will be required to construct and maintain flow bypass systems that will bypass all wastewater that normally flows through the Headbox structure. Bonds required. Prevailing wages.

Dalton Gamboa
 Login or create an account
 Login or create an account

Owner: County of Pierce WA

Published 10/21/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.