Segment E Wharf and State Highway 529 Stability Improvements, Everett, WA

Snohomish County

Owner Reference: MR-CM-2023-02

Bid Date: 11/19/2024 at 02:00pm

Pre-Bid: 10/30/2024 @ 02:00pm

Estimate: <$4,500,000

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The overall project consists of the reconstruction of the existing Segment E bulkhead and wharf. The existing 165 LF creosote timber bulkhead will be replaced with a new 165 LF of vertical steel sheet pile bulkhead wall along the entire water frontage. The sheet piles will be installed waterward of the existing bulkhead to avoid causing instability of the ground upland of the bulkhead if it were to be removed. The area behind the new bulkhead will be backfilled with gravel borrow fill material to encapsulate the existing bulkhead in place. In addition, in order to connect the new bulkhead to an existing bulkhead on the south end of the project, a steel sheet pile cut-off wall will be installed. Soils behind the proposed bulkhead wall will be improved with the addition of 24-inch diameter rigid ground inclusions. Because the face of the replacement bulkhead is moving approximately 10 feet waterward, the existing outfall pipe needs to be extended through the new bulkhead. The existing timber wharf (piles and deck) will be removed in its entirety. This includes demolition of wharf and fender timber piles (creosote-treated timber piles and diameter steel pipe piles). The existing wharf will be replaced with a new wharf consisting of steel pipe piles supporting steel pile caps, timber stringers, and a timber deck. There will also be steel fender piles installed to protect the wharf’s edge. New overwater coverage is needed to fix a pinch point in the current pedestrian and commercial fishermen’s access configuration. Additional work includes performing soil stabilizing rigid inclusions, building two new landscape beds with plantings and irrigation, site lighting, hardscapes restoration, and site furnishings. DBE COA Goal 21%. Bonds required. Prevailing wages.

Bonfire Webpage, email only
 Login or create an account

Owner: Port of Everett WA

Published 10/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450