ID 728674
Snohomish County
Owner Reference: RR43065, WC3065, UPI 22-0038 / 24-0304
Bid Date: 11/19/2024 at 11:00am
Pre-Bid: 11/04/2024 @ 10:00am
Estimate: $867,468
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Contract provides for the improvement of the Middle Pilchuck River Restoration Project. This project will reconnect the right bank historical floodplain to the Pilchuck River, install engineered log jams (ELJs) as well as large woody material (LWM) on the floodplain and main channel of the Pilchuck River, and excavate to reconnect remnant swales of the Pilchuck River within the Project area floodplain. The primary goal of the Project is to increase and improve rearing, foraging, and in-stream habitat for Chinook salmon, steelhead, bull trout, other salmonid species, and other work. Bonds required. Prevailing wages.
Purchasing
Login or create an account
Login or create an account
Owner: County of Snohomish WA
Published 10/30/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.