ID 728674
Archived
Snohomish County
Owner Reference: RR43065, WC3065, UPI 22-0038 / 24-0304
Bid Date: 11/19/2024 at 11:00am
Pre-Bid: 11/04/2024
East end of 28th Place NE off of Russell Road, Snohomish, WA
Estimate: $867,468
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Contract provides for the improvement of the Middle Pilchuck River Restoration Project. This project will reconnect the right bank historical floodplain to the Pilchuck River, install engineered log jams (ELJs) as well as large woody material (LWM) on the floodplain and main channel of the Pilchuck River, and excavate to reconnect remnant swales of the Pilchuck River within the Project area floodplain. The primary goal of the Project is to increase and improve rearing, foraging, and in-stream habitat for Chinook salmon, steelhead, bull trout, other salmonid species, and other work. Bonds required. Prevailing wages.
County of Snohomish WA
Purchasing
Login or create an account To view email
Published 10/30/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.