Broadway Water Main Replacement, Snohomish, WA

Snohomish County

Bid Date: 11/20/2024 at 01:00pm

Estimate: $3,272,000

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

This project consists of the installation of approximately 4,000 linear feet of 12-inch ductile iron water main, and approximately 2,200 linear feet of 8-inch ductile iron water main, along and in the vicinity of Broadway Avenue and 164th Street SE as shown on the Plans and as described in the Specifications. The project also includes the installation of a new package pressure reducing valve station, new water services, hydrants, valves, connections to the existing water system, pavement restoration and other general restoration and the removal of approximately 4,500 linear feet of existing 6-inch asbestos concrete water main. Also included in this project is the reinforcement of 100 linear feet of existing 8-inch ductile iron water main on Connelly Road along with the installation of new restrained joint fittings, in-line valves, hot mix asphalt trench patch, and general restoration, in anticipation of a future Snohomish County culvert project. Bonds required. Prevailing wages.

Purchasing
 Login or create an account

Owner: Cross Valley Water District WA

Published 11/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.