ID 627982

Archived

Kruger Creek Stabilization, Tigard, OR

Washington County

Owner Reference: 2022-16, CIP 2022 – 94046

Bid Date: 06/01/2022 at 02:00pm

Estimate: $4.15M

Trades: General Engineering Contractor GEC

The project generally consists of the following (the Work): 1. Installation of approximately 1,300 linear feet of 24-inch and 30-inch storm drainage pipe by trenching. 2. Installation of approximately 175 linear feet of 28-inch storm drainage pipe by slip lining. 3. Installation of storm drainage structures 4. Erosion and sediment control with in-water work, general excavation and slope stabilization. 5. Installation of rock buttress slope stabilization. 6. Creek bed restoration and stream enhancement. 7. Installation of gabion mesh retaining wall. 8. Gravel maintenance road rehabilitation. 9. Tree and invasive species removal. 10. Clean Water Services vegetated corridor seeding, planting, surface restoration, and maintenance period. 11. All other work required by the construction plans and specifications to rehabilitate Kruger Creek and stabilize adjacent slopes. Bonds required. Prevailing wages.

City of Tigard OR

Toni Riccardi
 503-718-2518

Published 05/07/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.