ID 711947
Archived
Henderson County
Owner Reference: 101213
Bid Date: 07/10/2024 at 02:00pm
Pre-Bid: 06/27/2024
115 Hammer Rd., Mabank, TX 75156.
Estimate: $1,750,000 - $2,000,000
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Tank Construction, Repair & Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera, Reservoirs, Lakes, Streams, Ponds, Channels, Water Barriers, Aquatic Plants, Wetland Restoration, Living Shorelines NAICS 562998
Replace two (2) 530,000 Gallon Ground Storage Tanks at the Brookshire WTP, backfilling existing backwash settling pond and replacing associated yard piping, valves, fittings and appurtenances. Bonds required. Prevailing wages.
East Cedar Creek FWSD Fresh Water Supply District TX
Shriram Manivannan, P.E.
4132
Login or create an account To view email
Published 06/25/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.