ID 717607

Archived

Turkey Peak Dam and Reservoir, Austin, TX

Palo Pinto County

Owner Reference: 10109424

Bid Date: 09/13/2024 at 02:00pm

Trades: Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor

The Project includes the following Work: Furnishing and installing materials, equipment, services, and incidentals for constructing a new 100-foot high, 3,700-foot long dam including concrete, steel pipe outlet and control valves, foundation grout curtain and abutment cutoff walls, spillway, earthen saddle dam, earth work, constructing approximately 2.5 miles of county roadway including six-span bridge, boat ramp, site work, highperformance industrial coatings, and other Work shown and indicated in the Bidding Documents. Bonds required. Prevailing wages.

Palo Pinto MUD1 Municipal Water District TX
 Lisa Singer
 Login or create an account To view email

Published 08/13/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.