ID 719775
Archived
Cook County
Owner Reference: 61K60 | IKT1(871)
Bid Date: 09/20/2024 at 12:00pm
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor
The scope of work generally consists of roadway removal and resurfacing. Additional improvements include sidewalk ramp modifications at signalized intersections for compliance with the Americans with Disabilities ACT (ADA), roadway lighting, streetscape and landscaping improvements, traffic signal modernization, traffic signal interconnection, the addition of high visibility crosswalks, pedestrian push buttons, and pedestrian countdown signals, as well as all incidental and collateral work to construct the project as shown on the plans and described herein. The improvements along Central Street will include water main and sewer replacement that will be locally funded. DBE goal 19%. Bonds required. Prevailing wages.
State of Illinois Department of Transportation (ILDOT) IL
IDOT Contracts Office
Login or create an account To view email
Published 08/27/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.