ID 719784
Archived
Cook County
Owner Reference: 61K72 | X72Q(211)
Bid Date: 09/20/2024 at 12:00pm
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47
The work consists of constructing a ten foot (10’) or seven foot (7’) wide Hot-Mix Asphalt Shared Use Path along the east side of 25th Avenue within the parkway. Storm sewers and drainage structures will be installed at certain locations within the parkway, and ADA improvements will also be addressed. At many locations sidewalk does not currently exist. DBE goal 17%. Bonds required. Prevailing wages.
State of Illinois Department of Transportation (ILDOT) IL
IDOT Contracts Office
Login or create an account To view email
Published 08/27/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.