ID 722181
Archived
San Mateo County
Owner Reference: 2024-091224
Bid Date: 10/16/2024 at 02:00pm
Trades: *A&E Architecture & Engineering: Professional Services, Consultant, Consulting & Planning Services, Stormwater Pollution Prevention Plan (SWPP), Regional Flood Planning Group (RFPG), Floodproofing & Flood Risk Reduction Plans
The Strategy to Advance Flood protection, Ecosystems Restoration and Recreation along San Francisco Bay (SAFER Bay) Project is a multi-jurisdictional and public-private collaboration to protect communities and critical infrastructure from sea level rise and tidal flooding in the cities of Menlo Park and East Palo Alto. Using both engineered structures and nature-based flood protection, the effort consists of a 7.5-mile alignment along the southeast San Francisco Bay shoreline designed to provide a 100-year level of flood protection in addition to 3.5 feet of sea-level rise. The Menlo Park SAFER Bay Project (“Project”) focuses on the 3.7-mile alignment and flood control elements located within the City of Menlo Park (“City”). The City is seeking services for the development of the design, environmental documentation, permitting, public outreach, and construction support for the Project from responsive, responsible, and qualified firms (“Proposers”; “Proposer”). Bonds required. Prevailing wages.
City of Menlo Park CA
Nancy Melgar
Login or create an account To view email
Published 09/15/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.