ID 722361

Archived

**New Bid Date**Methodist Pump Station Generator, Red Oak, TX

Ellis County

Owner Reference: 2024-10-03-14

Bid Date: 10/15/2024 at 02:00pm

Pre-Bid: 09/18/2024
101 Live Oak St, Red Oak, TX 75154.

Trades: Generator Contractor - Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, Machinery and Pumps Contractor; Motors & Variable Frequency Drives, Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

The project includes construction of a new generator and generator pad at Methodist Pump Station, relocation of the existing generator from the Methodist Pump Station to the Red Oak Government Center, and associated electrical and site improvements at the two sites as detailed in the Construction Plans and Specifications. Bonds required. Prevailing wages.

City of Red Oak TX
 Holly Deters
 Login or create an account To view email

Published 09/16/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.