ID 723882

Archived

Karns Crossing Bridge, Butler County, PA

Butler County

Owner Reference: 86105

Bid Date: 10/24/2024 at 11:00am

Estimate: $70,000,000.00 - $79,999,999.99

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S

This project involves the Intersection improvements and replacement of the 12-span Karns Crossing Bridge which spans over the Bessemer & Lake Erie Railroad and the Buffalo & Pittsburgh Railroad as well as replacement of the twin-cell arch culvert and other miscellaneous construction. DBE 7%. Bonds required. Prevailing wages.

State of Pennsylvania Department of Transportation (PADOT or PENNDOT) PA
 ECMS

Published 09/25/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.