ID 724951

Archived

Reconstruction/Rehabilitation on Route 12 (Central Street), Including Rehabilitation of L-08-022 in the City of Leominster, Leominster, MA

Worcester County

Owner Reference: 604499-127960

Bid Date: 10/16/2024 at 02:00pm

Trades: Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47

The work under this Contract consists primarily of resurfacing, and includes improvements for pedestrian/bicycle accommodations, drainage, access control, intersection traffic control, and aesthetics, as well as replacement of the existing bridge over Fall Brook. The project is considered a 3R project, beginning at the Sterling town line extending over approximately 13,455 feet to the limit of State Highway Layout at Tocci Street. The project includes restriping to provide 5’ shoulders for bicycle accommodations; installation of pedestrian signals across Willard Street at the westerly approach to Route 12; geometric reconfiguration at the Litchfield intersection; upgrades to the emergency preemptive signal at the Leominster Fire Department; excavation; pavement milling and box widening; pavement resurfacing; installing new drainage structures and pipe; placement of modified rockfill; installing new granite curb; removing and resetting existing granite curb; constructing ADA compliant cement concrete sidewalks and wheelchair accessible ramps; installing erosion control devices; installing guardrail; furnishing and spreading loam and seed; installing signs and pavement markings; furnishing and setting bounds; providing traffic control; and other incidental items of work listed in the proposal. The work also involves the replacement of the existing bridge L-08-022 carrying ST 12 (Central Street) over the Fall Brook. The work shall include the demolition and disposal of the existing bridge superstructure and partial removal of existing bridge substructure. Work also includes the construction of a new single span structure utilizing S36-18 deck beams with an 8” concrete deck and 3” wearing surface supported on an integral abutment and founded on H-piles as shown on the plans. The work to be done under this contract shall be completed in two stages. Bonds required. Prevailing wages.

Commonwealth and State of Massachusetts Department of Transportation (MassDOT or MADOT) MA
 Jonathan Gulliver

Published 10/03/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.