ID 725711
Archived
San Benito County
Owner Reference: 2024-001
Bid Date: 11/14/2024 at 05:00pm
Pre-Bid: 10/16/2024
30 Mansfield Road in Hollister, California. Bidders shall attend one of the two MANDATORY Pre-Bid Conferences and Site Walk prior to submitting a bid. Only the prime is required to attend the Pre-Bid meeting. Prospective bidders MAY NOT visit the Site without making arrangements through the Owner. Meetings will be held at the District office located at 30 Mansfield Road in Hollister, California on the following dates and times: October 16, 2024 at 1:00 PM October 23, 2024 at 1:00 PM
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The West Hills Water Treatment Plant was originally constructed in 2017 and is owned by the San Benito County Water District. The plant has an existing design capacity of 4.5 MGD and will be expanded to 6.75 MGD with this project. The main components of the project include: • One new 2.25 MGD raw water pump added to the existing raw water pump station • One new 3.0 MGD automatic strainer added upstream of Actiflo-Carb • One new 4.5 MGD ballasted clarification pretreatment based on Veolia’s Actiflo Carb treatment process • One new 2.25 MGD dual media gravity filter with plastic block underdrains • One 6650-gallon sodium hydroxide chemical storage tank • One new solids drying bed sized for the 2.25 MGD expansion Bonds required. Prevailing wages.
County of San Benito CA
Arthur Xu
Login or create an account To view email
Published 10/08/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.