ID 732870
Archived
Hays County
Owner Reference: IFB 224-288
Bid Date: 01/09/2025 at 02:00pm
Pre-Bid: 12/03/2024
Requests for access to video conference must be submitted to RShelton@sanmarcostx.gov at least 30 minutes prior to the pre-bid videoconference.
Estimate: $2,319,007.15
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Scope of Project: Includes but is not limited to reversing flow by reconstructing a portion of the gravity main (approx. 350 LF) on Davis Lane and installing a gravity main crossing across Davis Lane; constructing a lift station capable of 1,000 GPM flow; and constructing 10” and 6” HDPE force main (approx. 50 LF) and tie into existing 10” and 6” force main. Bonds required. Prevailing wages.
City of San Marcos TX
Rachel Shelton
Login or create an account To view email
Published 12/01/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.