Constructing the Roadway Improvements (Intersection Improvements, Left Turn Lane Installation, and Traffic Signal Upgrades) on SR-3, Cullman County, AL

Cullman County

Owner Reference: ATRP2-22-2023-260

Bid Date: 12/06/2024 at 10:00am
14 Days until bid date

Estimate: $747,526 to $913,643

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor

Constructing the Roadway Improvements (Intersection Improvements, Left Turn Lane Installation, and Traffic Signal Upgrades) on SR-3 (US-31) at SR-91 in Hanceville. Length 0.136 mi. DBE 1%. Bonds required. Prevailing wages.

Office of Engineer: Plans & Proposals
 Login or create an account
 Login or create an account

Owner: State of Alabama Department of Transportation (ALDOT) AL

Published 11/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450