Constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-18, Lamar County, AL

Lamar County

Owner Reference: STPAA-HSIP-0018(515)

Bid Date: 12/06/2024 at 10:00am
13 Days until bid date

Estimate: $2,817,889 to $3,444,086

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Cementations Coating Systems, Recoating & Seal Coating or Sealings, Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollard , Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor

Constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-18 from a point 0.710 mile east of the junction of CR-31 to the junction of 10th Street Northwest in Vernon. Length 4.406 mi. DBE .50%. Bonds required. Prevailing wages.

Office of Engineer: Plans & Proposals
 Login or create an account
 Login or create an account

Owner: State of Alabama Department of Transportation (ALDOT) AL

Published 11/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450