Constructing the Bridge Rehabilitation and Corrosion Mitigation on SR-193, Mobile County, AL

Mobile County

Owner Reference: BR-0193(509)

Bid Date: 01/31/2025 at 10:00am
35 Days until bid date

Pre-Bid: 01/07/2025 @ 10:00am

Estimate: $30,717,770 to $37,543,941

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads/Runways Bridges, Overpasses, Asphalt, Land Clearing, Trails/Paths, Rock Slope Construction Mitigation & Stabilization - General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment

Constructing the Bridge Rehabilitation and Corrosion Mitigation on SR-193 (Dauphin Island Bridge) from the Northern End to the Southern End. Length 3.449 mi. Bonds required. Prevailing wages.

Office of Engineer: Plans & Proposals
 Login or create an account
 Login or create an account

Owner: State of Alabama Department of Transportation (ALDOT) AL

Published 12/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450