ID 735930
Mobile County
Owner Reference: BR-0193(509)
Bid Date: 01/31/2025 at 10:00am
35 Days until bid date
Pre-Bid: 01/07/2025 @ 10:00am
Estimate: $30,717,770 to $37,543,941
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads/Runways Bridges, Overpasses, Asphalt, Land Clearing, Trails/Paths, Rock Slope Construction Mitigation & Stabilization - General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment
Constructing the Bridge Rehabilitation and Corrosion Mitigation on SR-193 (Dauphin Island Bridge) from the Northern End to the Southern End. Length 3.449 mi. Bonds required. Prevailing wages.
Office of Engineer: Plans & Proposals
Login or create an account
Login or create an account
Owner: State of Alabama Department of Transportation (ALDOT) AL
Published 12/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450