ID 730957
Pickens County
Owner Reference: STPAA-FMGR-0159(505)
Bid Date: 12/06/2024 at 10:00am
3 Days until bid date
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollard , Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor
Constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-159 from the junction of Fox Ridge Drive north of Gordo to the Fayette County Line. Length 15.673 mi. DBE 3%. Bonds required. Prevailing wages.
Office of Engineer: Plans & Proposals
Login or create an account
Login or create an account
Owner: State of Alabama Department of Transportation (ALDOT) AL
Published 11/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450