ID 730954
Russell County
Owner Reference: STPAA-FMGR-0165(507)
Bid Date: 12/06/2024 at 10:00am
Estimate: $1,253,588 to $1,532,163
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Cementations Coating Systems, Recoating & Seal Coating or Sealings, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor
Constructing the Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II), and Traffic Stripe on SR-165 from a point 0.250 mile south of the junction of SR-208 to a point 0.360 mile south of the junction of New Hope Church Road. Length 5.110 mi. Bonds required. Prevailing wages.
Office of Engineer: Plans & Proposals
Login or create an account
Login or create an account
Owner: State of Alabama Department of Transportation (ALDOT) AL
Published 11/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450