Constructing the Roadway Improvements and Additional Lanes on I-65, Shelby County, AL

Shelby County

Owner Reference: NHF-IMF-I065(543)

Bid Date: 01/31/2025 at 10:00am
35 Days until bid date

Pre-Bid: 01/08/2025 @ 10:00am

Estimate: $61,605,597 to $75,295,730

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads/Runways Bridges, Overpasses, Asphalt, Land Clearing, Trails/Paths, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales

Constructing the Roadway Improvements and Additional Lanes (Grading, Drainage, Pavement, Bridge Removal, and Bridge Replacement) on I-65 from a point 0.560 mile south of Buck Creek to a point 1.000 mile north of the SR-3 (US-31) Interchange in Alabaster. Length 3.111 mi. DBE 3%. Bonds required. Prevailing wages.

Office of Engineer: Plans & Proposals
 Login or create an account
 Login or create an account

Owner: State of Alabama Department of Transportation (ALDOT) AL

Published 12/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.