Fire Station 703 Fuel Tank Replacement, Buckeye, AZ

Maricopa County

Owner Reference: IFB 2025224

Bid Date: 01/06/2025 at 03:00pm
11 Days until bid date

Pre-Bid: 12/11/2024 @ 08:00am

Estimate:  $175,000

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Due to growth, the City of Buckeye intends to upsize the size of the existing fuel tank at Fire Station 703. Due to the location of the site to a new City Hall East at the Landing, this site is experiencing increased fuel consumption. The proposed tank is to be 8,000 gallons. Bids shall include all labor, materials, permits, testing, sensors, and equipment for a complete system. The new 8,000-gallon tank is planned to be installed on the existing pad. No site work is anticipated to complete the installation. Coordination for installation will need to be closely detailed due to this being an active Fire Station responding to emergency calls. Work hours for the site generally starts at 7:00 A.M given its proximity to homes. The selected contractor will be responsible for maintaining a clean working environment. The work should be closely coordinated with staff so as not to interrupt emergency operations. Bonds required. Prevailing wages.

Diana Landeros
 Login or create an account
 Login or create an account

Owner: City of Buckeye AZ

Published 12/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.