ID 733651
Maricopa County
Owner Reference: IFB 2025224
Bid Date: 01/06/2025 at 03:00pm
11 Days until bid date
Pre-Bid: 12/11/2024 @ 08:00am
Estimate: $175,000
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Due to growth, the City of Buckeye intends to upsize the size of the existing fuel tank at Fire Station 703. Due to the location of the site to a new City Hall East at the Landing, this site is experiencing increased fuel consumption. The proposed tank is to be 8,000 gallons. Bids shall include all labor, materials, permits, testing, sensors, and equipment for a complete system. The new 8,000-gallon tank is planned to be installed on the existing pad. No site work is anticipated to complete the installation. Coordination for installation will need to be closely detailed due to this being an active Fire Station responding to emergency calls. Work hours for the site generally starts at 7:00 A.M given its proximity to homes. The selected contractor will be responsible for maintaining a clean working environment. The work should be closely coordinated with staff so as not to interrupt emergency operations. Bonds required. Prevailing wages.
Diana Landeros
Login or create an account
Login or create an account
Owner: City of Buckeye AZ
Published 12/05/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.