CBS ID: 747629
Pima County
Owner Reference: 2025-001, Proj PDFAC
Bid Date: 04/03/2025 at 03:00pm
Pre-Bid: 03/13/2025 @ 10:00am
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project generally consists of supplying all labor, materials, tools, and equipment necessary to install various security enhancement features throughout the Marana Public Safety Facility and Marana Municipal Complex surrounding campus with intent of matching the existing site display. The scope of work for the Base Bid located at the complex courtyard includes electrical conduit trenching, conductors, and pull boxes; installation of new lighting fixtures and poles with receptacles as well as wall mount fixtures; new directional monument sign with electrical changeable message board; steel planter with concrete seating structure; demolition work with removal and replacement of existing bollards, concrete flatwork, and paver bricks; new handrail, decorative landscape boulders, and concrete sidewalk apron; installation of new fixed, removable, and lighted stainless steel security bollards, and other miscellaneous work. The scope of work for Bid Additive Alternate No. 1 involves demolition of some existing curb and asphalt for the installation of two new electrical security drop gates with badge swipe access, and including all necessary appurtenances and features identified in the project plan details and specifications related to Area of Work 13. This work is located at the entrance to the Marana employee parking lot and includes electrical conduit trenching, extension of an existing curb island and more. The scope of work for Bid Additive Alternate No. 2 consists of the installation of both fixed and removable stainless steel security bollards, and decorative boulders at campus perimeter areas adjacent to West Civic Center Drive. Existing landscape irrigation components encountered during demolition, trenching or excavation operations will need to be cut and capped or relocated as necessary to accommodate installation of the new elements. There is a bid item allowance in the Base Bid for the costs associated with this work. Bonds required. Prevailing wages.
Rudy Torres
Login or create an account
Login or create an account
Owner: Town of Marana AZ
Published 03/06/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.