Western Corridor Storage & Transmission Main Improvements, Springdale, AR

Washington County

Owner Reference: 23A18-a

Bid Date: 12/13/2024 at 02:00pm

Pre-Bid: 12/03/2024 @ 09:00am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

This project includes the construction of approximately 22,000 linear feet of 48-inch water transmission piping and 3,000 linear feet of 24-inch piping, including valves, bores, and road crossings. The new transmission line will convey pipe from the new Beaver Water District Western Corridor Pump Station (constructed by CHC via a separate project) to a point in the Springdale Water Utilities distribution system. The work in this package is split up into Schedule A and Schedule B for delineation purposes. Please consider bidding both packages. Bonds required. Prevailing wages.

Ryan Adler
 Login or create an account
 Login or create an account

Owner: Springdale Water Utilities AR

Published 11/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.