ID 724647
Alameda County
Owner Reference: CAP18024
Bid Date: 10/25/2024 at 02:00pm
Pre-Bid: 10/03/2024 @ 11:00am
Estimate: $900,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C12 - Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor
The Project scope of this project includes, but is not limited to pathway resurfacing in four Parks: Earl Warren Park in Castro Valley, Hillcrest Knolls in San Leandro and Birchfield and Fairway Greens Park in Hayward, California. Over time, park pathways have deteriorated. Pathways in each park will be repaired, refurbished, and/or reconstructed according to the specified requirements specific to each Park. Reconstruction treatments may include grinding and paving, full asphalt or concrete pavement (re)construction, or pavement removal and restoration with alternate surfaces such as aggregate base, or decomposed granite. Project includes restoration of lawn or landscaped surfaces and irrigation affected by construction. Bonds required. Prevailing wages.
Diane Hardy
Login or create an account
Login or create an account
Owner: Hayward Area Recreation & Park District CA
Published 10/01/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.