Subcontractor Opportunities: *REBID* Cory Hall 1st Floor East HVAC System Replacement , Berkley, CA

Alameda County

Owner Reference: 16228A

Bid Date: 12/19/2024 at 01:00pm

Pre-Bid: 11/20/2024 @ 11:00am

Trades: Subcontractor Opportunities

Scope includes but is not limited to: Provide Variable Refrigerant Flow (VRF) fan coil units and associated outdoor condensing unit CU-1, refrigerant piping and controls for rooms 159,161, 163, 173, and 175B. Provide engineered supports and anchors. Provide Mitsubishi multi-city fan coil units and associated, controls, power supply and disconnect, refrigerant piping, condensate drain piping, insulation, supports and anchors. Provide Mitsubishi 'City Multi' variable refrigerant flow zoning system (VRF) Y Series outdoor condensing unit (CU-1 and CU-2). The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: “B” - General Building AND “C-20” Warm-Air Heating, Ventilating and Air-Conditioning Contractors License.

Contract Admin
 Login or create an account
 Login or create an account

Owner: University of California Berkeley (UCB) CA

Published 12/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.