ID 730387
Butte County
Owner Reference: 50424
Bid Date: 12/04/2024 at 04:00pm
13 Days until bid date
Pre-Bid: 11/21/2024 @ 01:00pm
Estimate: $4,750,000.00
Trades: C12 - Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
The work, in general, to be done under this contract consists of connecting to an existing unused sewer main near the intersection of Hegan and Midway south of the City of Chico and extending the sewer main south along Midway to Entler Avenue then east and south along Entler Avenue and terminating near State Route 99. The project will include the installation of sewer main, sewer manholes, pavement grinding and overlay, slurry sealing, pavement removal, repavement and striping. The work will take place primary within unincorporated areas of Butte County. The work to be done will generally consist of: Clearing and grubbing Construction surveying Cold planning asphalt Minor concrete Aggregate Base Asphalt paving Slurry Seal Laying PVC Sewer Pipe 8”-27” Roadway Signs Striping And all other work as shown on the contract plans. At the time the City awards the contract for this project, the Contractor shall possess either a Class A Contractor License or a combination of classes required by the categories and types of work included in this contract.
Ryan Morris
Login or create an account
Login or create an account
Owner: City of Chico CA
Published 11/12/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.