Frick Unit – Phase 1 Turnout, Arvin, CA

Kern County

Bid Date: 10/31/2024 at 11:00am

Pre-Bid: 10/23/2024 @ 10:00am

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , C8 - Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47

In general, the Work consists of a reinforced concrete irrigation turnout structure, bypass irrigation flows, canal lining, levee embankment, 42-inch reinforced concrete low head irrigation pipe including bends, air vents, gate, open cut Muller Road encased crossing, and site electrical components. Prevailing wages.

Angie Duran
 Login or create an account
 Login or create an account

Owner: Arvin Edison Water Storage District (AEWSD) CA

Published 10/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.