ID 730703
Kern County
Owner Reference: E4K308
Bid Date: 12/12/2024 at 11:00am
Pre-Bid: 11/21/2024 @ 10:00am
Estimate: $1,487,000.00
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C42 - Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners
The work to be performed consists, in general, of the reconstruction of an existing lift station, referred to herein as the Ming/Grand Lakes Lift Station, located at the northeast corner of the intersection of Ming Avenue and Grand Lakes Avenue. More specifically, the work includes the installation and maintaining of temporary bypass pumping; abandonment of existing sewer lines; construction of new sewer lines and force main with manholes and tie-in to existing manholes; re-lining of the Ming/Grand Lakes Lift Station complete with all appurtenances; construction of lift station site improvements such as grading and aggregate base surfacing; furnish and install all electrical items and coordination with the utility company; testing and adjustment of equipment; and all other items necessary to complete the project as specified herein. Bonds required.
Aaron McWilliams
Login or create an account
Login or create an account
Owner: City of Bakersfield CA
Published 11/14/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.