*New Bid Date* Metro Hot Spot Intersections: Whittier Blvd at Santa Fe Springs Rd and Whittier Blvd at Painter Ave Improvement Project, Whittier, CA

Los Angeles County

Owner Reference: 24-023

Bid Date: 10/29/2024 at 11:00am

Estimate: $11,000,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The Project limits reside within both the City of Whittier and Caltrans right-of-way. Contractor is required to pull permits from Caltrans, Los Angeles County Public Works, the City of Whittier Public Works Department (no-fee permit), and the City of Whittier Building Department (no-fee permit). The Project consists of improvements on Whittier Boulevard at two intersections; Santa Fe Springs Road (Bid Schedule A) and Painter Avenue (Bid Schedule B). The Project will include re-alignment of Whittier Boulevard, reconstruction of curb ramps, passageways, driveways, and sidewalks adhering to Americans with Disability Act (ADA) standards, median reconstruction, street widening, drainage modifications, asphalt concrete pavement, installation of a retaining wall between the Greenway Trail Pedestrian overcrossing and bridge abutment to allow improved line-of-sight, traffic signal modifications, street lighting modifications, and signing and striping at the intersection. Prevailing wages.

Public Works
 Login or create an account
 Login or create an account

Owner: City of Whittier CA

Published 08/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.