ID 727327
Los Angeles County
Owner Reference: 2024-1018
Bid Date: 11/12/2024 at 03:00pm
13 Days until bid date
Pre-Bid: 10/29/2024 @ 09:00am
Trades: C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's
The City of Pomona is seeking informal quotes from qualified firms for maintenance services and repairs on a Split-System Air Conditioning Heat Pump Units, Heating, Ventilation, and Air Conditioning (HVAC), in accordance with the Scope of Service or Specifications stated herein. Work to include: Maintenance and perform repairs of the Split-System Air Conditioning Heat Pump Units (System) in accordance with the SAMSUNG Air Conditioner Installation Manual, AC***BNADCH, (Attachment 1). Furnish and install all necessary equipment for proper operation of the System. Must comply with all applicable CalOSHA safety rules, protocols and procedures. Must ensure that the System is maintained at the minimum standard recommended by the manufacture or better. Must maintain written records of all maintenance and repairs performed on the System, records must be readily accessible to City staff. Must provide written description of maintenance and/or repairs performed at each site visit. Technician must be in clearly identifiable uniform and have identification at all times. Must comply with Air Quality Management District of Southern California (AQMDSC) California Air Board (CARB) rules at all times. All materials, parts and equipment utilized in performing maintenance and repairs must be Original Equipment Manufacturer (OEM). All proposed OEM substitution must be approved by the City prior to installation. Prevailing wages.
Sonia Gil
Login or create an account
Login or create an account
Owner: City of Pomona CA
Published 10/21/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.