ID 727859
Los Angeles County
Owner Reference: CIP 14-14B, Fed #STPL-5334(0
Bid Date: 11/07/2024 at 11:00am
Estimate: $5,391,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The work to be performed under this Contract generally consists of pavement rehabilitation of Woodruff Avenue, between Washburn Road and Foster Road, as shown on the Plans. This project includes reconstruction of failed pavement areas, cold milling of asphalt pavement; construction of fiber-reinforced asphalt concrete (AC) base course and asphalt rubber hot mix (ARHM) overlay. Work also includes construction of raised center median islands, repair of uplifted, damaged or substandard concrete curb, gutter, sidewalk, drive approaches and curb ramps; installation of landscaping and irrigation in proposed center median islands and existing frontage road islands, adjustments of manhole and utility valve covers to the new grade, replacement of traffic striping, pavement markings and signing; traffic control and all appurtenant work thereto necessary for the proper construction of the contemplated improvements in accordance to Plans and Specification entitled Capital Improvement Project No. 14-14B. DBE goal is 22%. Bonds required. Prevailing wages.
Edwin Norris
Login or create an account
Login or create an account
Owner: City of Downey CA
Published 10/24/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.