Traffic Signal Modification - Avalon Boulevard & Gardena Boulevard, Carson, CA

Los Angeles County

Owner Reference: 1667

Bid Date: 12/12/2024 at 11:00am
18 Days until bid date

Pre-Bid: 11/19/2024 @ 10:00am

Estimate: $625,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The Project includes the construction of roadway and traffic signal modifications at the existing traffic signal-controlled intersection of Avalon Boulevard and Gardena Boulevard in the City of Carson. Gardena Boulevard is an east-west collector and Avalon Boulevard is a north-south arterial, the intersection of which is located in the northern section of the City of Carson. Both streets experience significant travel delays, partially due to deficient levels of service at the intersection of Gardena Boulevard and Avalon Boulevard. The traffic signal at this intersection will be upgraded and improved to provide new left turn phases at the north and south approaches, a video detection system, emergency vehicle preemption operation, upgraded safety lighting, and pedestrian head upgrades. The traffic signal controllers will be programmed to ensure efficient and safer vehicle, pedestrian, and bicycle travel; improve the level of service; and reduce delays at the project intersection. Bonds required. Prevailing wages.

Josilla Togiola
 Login or create an account
 Login or create an account

Owner: City of Carson CA

Published 11/08/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.