Residential Streets Pavement Rehabilitation Project Area 3, Downey, CA

Los Angeles County

Owner Reference: 22-22

Bid Date: 01/06/2025 at 09:00am
15 Days until bid date

Estimate: $4,000,000

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The work to be performed under this Contract generally consists of pavement rehabilitation on 62 street segments in Area 3 of the City of Downey. This project includes the reconstruction of failed pavement areas, cold milling of asphalt pavement, construction of asphalt concrete leveling course, base course, and asphalt rubber hot mix (ARHM) overlay. Work also includes removal and reconstruction of uplifted, damaged, or substandard curb, gutter, cross gutters and spandrels, sidewalk, driveway approach, and curb ramps; adjustments of manhole and utility valve covers to the new grade, replacement of traffic striping, pavement markings, and loop detectors; traffic control and all appurtenant work thereto necessary for the proper construction of the contemplated improvements, in accordance to Plans and Specification entitled Capital Improvement Project No. 22-22. Bonds required. Prevailing wages.

Engineering Department
 Login or create an account
 Login or create an account

Owner: City of Downey CA

Published 12/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.