ID 735648
Madera County
Owner Reference: R-97
Bid Date: 01/21/2025 at 02:00pm
19 Days until bid date
Pre-Bid: 01/09/2025 @ 02:00pm
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C55 - Water Conditioning Equipment Contractor: Water Quality, PFAS Detection, Monitoring, Testing & Mitigation
The work in general consist of installing a new 8" and 10" water main in Clinton St. between Tozer St. and Fig St. and the installation of cured-in-place pipe (CIPP) liners in existing sewer mains including the modifications of manholes in Clinton St. between Vineyard Ave and Malone St. and Manzana Ct. to Elem St. Bonds required.
Elisa Perez
Login or create an account
Login or create an account
Owner: City of Madera CA
Published 12/19/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.