Melvin Road Sidewalk & Drainage Improvements, American Canyon CA

Napa County

Bid Date: 11/07/2024 at 02:00pm

Pre-Bid: 10/23/2024 @ 02:30pm

Estimate: $2,257,865

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The project consists of the following general work pursuant to the construction of sidewalk, curb & gutter, and storm drain facilities along Melvin Road, Wilson Way, and James Road: 1. Potholing of existing utilities 2. Site clearing and demolition 3. Grading and earthwork for sidewalk / curb and gutter installation 4. Trenching and storm drain conduit installation 5. Minor utility adjustments as needed for pipe - pipe crossings 6. Pavement restoration 7. Install traffic signs, striping, traffic calming measures 8. Pavement and landscape restoration. Bonds required. Prevailing wages.

Ron Ranada
 Login or create an account
 Login or create an account

Owner: City of American Canyon CA

Published 10/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450